Projects
Projects / LACMA

This complex project was built underground at the La Brea tar pits and was constructed amidst the congested area of the Miracle Mile.  The project included a complete methane mitigation system and a 27,000 cubic yard mat foundation.  This subterranean two-level, 500 stall project was built on time and under budget.


 

 

© Copyright 2017, ARB Structures Inc. All rights reserved.